20×24 slab: concrete by thickness

ThicknessCu ftCu yd80 lb bags60 lb bags
3.5″140.005.19234312
4″160.005.93267356
5″200.007.41334445
6″240.008.89400534

No waste included in the table.

Worked example

20 ft × 24 ft = 480 sq ft. At 4 inches: 480 × 4 ÷ 12 = 160.00 cu ft, or 5.93 cubic yards. With 10% extra that is 6.52 yd³, or 294 bags of 80 lb mix.

At over 1 cubic yard, compare the cost and labor of bags against a ready-mix delivery.

Assumes standard concrete mix bag yields: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft. Check the yield on your bag. 1 cubic yard = 27 cubic feet.

Frequently asked questions

How many bags of concrete for a 20×24 slab?

267 × 80 lb or 356 × 60 lb bags at 4 inches thick, before waste.

How many yards of concrete for a 20×24 slab?

5.93 cubic yards at 4 inches; 8.89 at 6 inches.